HomePortalGallerySearchRegisterLog in

Share
 

 May 6 Engineering Day

Go down 
AuthorMessage
Admin
Admin


Posts : 166
Join date : 2010-08-16

May 6 Engineering Day Empty
PostSubject: May 6 Engineering Day   May 6 Engineering Day EmptyTue Aug 17, 2010 8:38 pm

Ok so did another haul of lumber today from the dump scored some 6x6 rafter Beams ..SCORE..

Manged to clear some trails moved the perimeter on the back of the field 20 feet deeper. Completed
a new double wide tower we decided to call it Deer Leg Tower as Kato brought over a deers leg bones during construction way to go dog he helped lol.

Transam and Blackdog managed to clear a new look out we call it Drift Wood lookout. It oversees the back end of the field from about 25 foot height.Scored two Sattelite Dish mounts so we can stick flag poles in them.

THe place is really coming together good work guys again. Enjoy the pics everyone.

Bucky out

May 6 Engineering Day DSCN1521
May 6 Engineering Day DSCN1506
May 6 Engineering Day DSCN1504
May 6 Engineering Day DSCN1505
May 6 Engineering Day DSCN1508
May 6 Engineering Day DSCN1509-1
May 6 Engineering Day DSCN1512
May 6 Engineering Day DSCN1511
May 6 Engineering Day DSCN1518
May 6 Engineering Day DSCN1534
May 6 Engineering Day DSCN1533
May 6 Engineering Day DSCN1532
Back to top Go down
https://dogsofwarpaintball.canadian-forum.com
 
May 6 Engineering Day
Back to top 
Page 1 of 1

Permissions in this forum:You cannot reply to topics in this forum
Dogs of War paintball Club :: Dogs With Jobs-
Jump to: